Well, obviously the April first date was wildly optimistic. As of June 5, the airplane is still waiting for the installation of the instrument panel. The avionics technician has been struggling with the intricate complexity of making everything work together.
When first powered up, the Garmin GMX 200 failed to work, was sent back to Garmin for repair, and when re-installed still refused to work. Garmin and the technician are working to resolve the issue, and the solution appears to rest with Garmin. So we need to return the unit once again
The S-TEC 55X autopilot drew too much current, so it was also returned to the manufacturer in Mineral Wells, TX. No word on timing for the return.
In order to accomodate the new overhead air system, the old B35 interior upholstery panels are being replaced with the newer style F33A panels. This requires a lot of careful fitting, but will clearly be a good upgrade when finished.
Work on the iirframe is now essentially completed. The shop is in the final stages of installing the Rosen Visors, Security door locks, lockng fuel caps, and OSA temperature sensors.