Tuesday, February 3, 2009

Status of the various projects

This posting includes photographs showing the status of the major work completed so far.

The left wing showing where the old "flying wing" stall indicator was removed.


The new stall indicator.


A new right flap assembly.


The new left aileron.


New aluminum honeycomb floorboards!


The "stinger" tail cone.


Polished stainless steel battery box, to be mounted on the engine side of the firewall. Also shown are the electrical solenoids, polished and ready to mount to the firewall.


The new instrument panel, mounted in the airplane and awaiting the final wiring harness and installation of avionics.

The repair where the old auxiliary fuel tank filler was removed.


The new outside air intake for the overhead air system.


More of the overhead air system.



2 comments:

  1. Does that overhead air scoop cost some speed? Does that help cool the engine/avionics or just for pax?

    ReplyDelete
  2. Does that overhead air scoop cost some speed? Does that help cool the engine/avionics or just for pax?

    ReplyDelete